OUR WORK

VALUED PARTNERS

LATEST PROJECTS

ABB Transformer Factory –  South Boston VA – USA

Client: ABB USA

Created a High Voltage testing bench for the testing of HV transformers at the ABB factor of South Boston.

PSE&G Tonnelle Substation – New Jersey – USA

Client: Siemens

Cable Splicing of 6 PFISTERER CONNEX size 5S + cable tray, cable rack and link box installation.

ABB Substation – Anaheim – CaliforniaA

Client: Hot Line Construction – ABB – City of Anaheim

Cable Splicing of 15 PFISTERER CONNEX size 4 + 6 TE EHVT 6gkV terminations + 6 TE OHVT 72kV Potheads.

NEXTERA Solar Plant – Wendel CA – USA

Client: ABB, NEXTERA

Connection of HV breaker and HV transformer with 9 PFISTERER CONNEX size 4 on a ABB SKID.

PSE&G Fair Lawn Substation

Client: SIEMENS – PSE&G

Cable Splicing of 6 PFISTERER CONNEX 5S + cable tray, cable rack and link box installation.

PSE&G MC Lean Substation

Client: Siemens – PSE&G

Cable splicing of 6 PFISTERER CONNEX size 5S + structure/link box installation.

Elba Island LNG Gas Plant

Client: MMR – SHELL

Splicing of 132 MV PFISTERER CONNEX 3XL

HOA Hansel Substation – Anaheim – CA

Client: Hot Line Construction – ABB – City of Anaheim

Splicing of 6 TYCO EHVT 69kV on transformer side.

WORK WITH US

CONTACT US

Do you need help with your project ? Fill out this form to get in touch.