ABB Transformer Factory – South Boston VA – USA
Client: ABB USA
Created a High Voltage testing bench for the testing of HV transformers at the ABB factor of South Boston.
PSE&G Tonnelle Substation – New Jersey – USA
Client: Siemens
Cable Splicing of 6 PFISTERER CONNEX size 5S + cable tray, cable rack and link box installation.
ABB Substation – Anaheim – CaliforniaA
Client: Hot Line Construction – ABB – City of Anaheim
Cable Splicing of 15 PFISTERER CONNEX size 4 + 6 TE EHVT 6gkV terminations + 6 TE OHVT 72kV Potheads.
NEXTERA Solar Plant – Wendel CA – USA
Client: ABB, NEXTERA
Connection of HV breaker and HV transformer with 9 PFISTERER CONNEX size 4 on a ABB SKID.
PSE&G Fair Lawn Substation
Client: SIEMENS – PSE&G
Cable Splicing of 6 PFISTERER CONNEX 5S + cable tray, cable rack and link box installation.
PSE&G MC Lean Substation
Client: Siemens – PSE&G
Cable splicing of 6 PFISTERER CONNEX size 5S + structure/link box installation.
Elba Island LNG Gas Plant
Client: MMR – SHELL
Splicing of 132 MV PFISTERER CONNEX 3XL
HOA Hansel Substation – Anaheim – CA
Splicing of 6 TYCO EHVT 69kV on transformer side.